The Commercial Construction Timeline: What to Expect

The Commercial Construction Timeline: What to Expect

How Long Does It Take to Build a Commercial Property?

The timeline for a commercial construction project depends on factors like size, complexity, permits, and weather conditions. At 303 Construction, we follow a structured process to ensure on-time delivery while maintaining high-quality standards.

Phase 1: Planning & Design (2-6 months)

  • Site selection & feasibility study to assess zoning laws.
  • Architectural & engineering designs finalized.
  • Budgeting & cost analysis conducted.
  • Permit applications & regulatory approvals processed.

Phase 2: Pre-Construction & Site Preparation (1-3 months)

  • Land clearing, grading, and soil testing.
  • Utility connections (electricity, water, sewage).
  • Ordering of long-lead materials.

Phase 3: Structural & Core Construction (4-12 months)

  • Foundation pouring and framing.
  • Roofing, windows, and doors installation.
  • Electrical, plumbing, and HVAC systems integrated.

Phase 4: Interior & Exterior Finishes (2-6 months)

  • Drywall, painting, and flooring installation.
  • Custom millwork, fixtures, and signage.
  • Final landscaping and parking lot construction.

Phase 5: Final Inspections & Handover (1-2 months)

  • City inspections and occupancy permit approval.
  • Walkthrough and final client approvals.

At 303 Construction, we offer project scheduling transparency to keep our clients informed at every stage. Contact us to discuss your commercial construction timeline today!

RELATED TOPICS

Building Code Requirements in Denver Storm Damage & Repair in Denver Home Remodeling & Renovation Costs of Residential Construction in Denver Green Building & Sustainability Commercial Construction Services Commercial Tenant Improvements Concrete & Foundation Work Outdoor Living & Hardscaping Historic Home Renovation Roofing Services