How Long Does It Take to Build a Commercial Property?
The timeline for a commercial construction project depends on factors like size, complexity, permits, and weather conditions. At 303 Construction, we follow a structured process to ensure on-time delivery while maintaining high-quality standards.
Phase 1: Planning & Design (2-6 months)
- Site selection & feasibility study to assess zoning laws.
- Architectural & engineering designs finalized.
- Budgeting & cost analysis conducted.
- Permit applications & regulatory approvals processed.
Phase 2: Pre-Construction & Site Preparation (1-3 months)
- Land clearing, grading, and soil testing.
- Utility connections (electricity, water, sewage).
- Ordering of long-lead materials.
Phase 3: Structural & Core Construction (4-12 months)
- Foundation pouring and framing.
- Roofing, windows, and doors installation.
- Electrical, plumbing, and HVAC systems integrated.
Phase 4: Interior & Exterior Finishes (2-6 months)
- Drywall, painting, and flooring installation.
- Custom millwork, fixtures, and signage.
- Final landscaping and parking lot construction.
Phase 5: Final Inspections & Handover (1-2 months)
- City inspections and occupancy permit approval.
- Walkthrough and final client approvals.
At 303 Construction, we offer project scheduling transparency to keep our clients informed at every stage. Contact us to discuss your commercial construction timeline today!